Destiny 2 5 of Swords

Destiny 2 Xur Time: Location and Inventory 3/2/18

It’s Destiny 2 Xur time, yet again! The mystery man has made his way back into the Destiny 2 universe, to bestow Guardians with gifts in exchange for the most curious of currencies. Legendary Shards will get you exotic weapons, armor, handy buffs to your exotic drop rate, and more.

Read on for this week’s Destiny 2 Xur location and inventory. And do remember: he’s only here until Tuesday! If you spot an exotic that you desperately desire, hurry up and grab it! There’s no telling when it will become available again.

Destiny 2 Xur Time: Xur Location

destiny 2 xur time

This week, players can find Xur on Titan, near The Rig landing zone.

Simply enter the world map, click the relevant planet, and then choose the closest landing zone. If available, use a vehicle to get to Xur quicker, and look out for hidden paths, which may require jumping and careful navigation!

Destiny 2 Xur Time: Xur Inventory

destiny 2 xur time

The featured weapon is The Wardcliff Coil, priced at 29 Legendary Shards.

Hunters can grab the Mechaneer’s Tricksleeves gauntlets for 23 Legendary Shards.

Titans have the option of picking up the Crest of Alpha Lupi chest armor for 23 Legendary Shards.

Warlocks have been granted the Eye of Another World helmet for 23 Legendary Shards.

Also available for purchase are Fated Engrams, which contain new, dupe-proof exotic items. These cost a hefty 97 Legendary Sharps apiece, which won’t be a problem for veterans, but newcomers may find that a little steep.

Three of Coins, which increase the drop rate of exotic engrams, can also be bought from Xur. Players will need to part with a more reasonable 31 Legendary Shards.

Join us again next week, when Xur will be in a new location, and selling a new set of items.

Upcoming Releases
Star Citizen is an upcoming space trading and combat simulator video game for Microsoft Windows. Star Citizen will consist of two main components: first person space combat and trading in a massively multiplayer persistent universe and customizable private servers (known as Star Citizen), and a branching single-player game (known as Squadron 42). The game will also feature VR support.
Atlas is an action-rpg with rogue-like elements where you use your ability to control the ground to fight the enemies and move through procedurally generated worlds.
Damnview: Built From Nothing is a simulation sandbox game about occidental culture and its different social classes. Immerse yourself into a decadent urban sprawl, all while working precarious jobs where you will either be absorbed into the system, or cast out of society’s machine. Damnview: Built From Nothing is a game about despair, the hostility of capitalism, and the need…
Development of Titanfall 3 was confirmed in the acquisition of Respawn Entertainment by Electronic Arts in November 2017.
Reviews
X